What makes a great cost estimate?

Construction cost estimating as a career choice? That was the question I asked myself many years ago. It was when I started working as a cost estimator (because I lacked a project management opportunity). I still make a living as a cost estimator and found the answer to my question: yes! What I enjoy the most is that it is never boring. I get to work on a vast variety of projects and learn something new with every single one. I spent half of my career in a supervisory or management position on construction sites. Switching to cost estimating was a natural career move.

During all the years that I have been doing cost estimating, there were two questions that I kept coming back to:

  1. How to be more productive. It does not matter how much time there is, it never seems enough.
  2. How to improve accuracy. I always have that feeling of “Am I sure I made no mistakes?”

Maybe most of you already have your own methods and tools to help with productivity and achieve higher accuracy. I will share with you what I use to help me achieve more in less time while improving the quality of my work.

1. Cost estimating and take-off software.

Construction estimating software shortens the time required to produce a cost estimate. And, of course, reduces the margin for error. There are many options available to choose from. And they all have their own merits or shortcomings.

I value this benefit in cost estimating software: flexibility and ease of use. And when I say flexibility, I think of:

2. Cost Estimating Database.

This is the only and the most important item on my list when estimating costs. I can replace the estimating software with excel if need be, I can do manual take-off. But, I cannot develop a cost estimate without using my database. Over the years, my database grew to include data from all projects that I had the privilege to do the cost estimate. And I will keep adding to it in the years ahead.

I structure my database as follows:

Setting up the various databases is not a difficult task. The challenge begins when assigning crews and production rates to each activity. This task deserves the most attention of a senior cost estimator.

A mix of industry-published data and company-specific cost control data, fed back to the cost estimating team, is a must-have. And this is where the benchmark data comes into play:

3. Benchmark data.

What is a cost estimate without any validation by real data? Most construction companies have a structure in place to provide feedback to the cost-estimating team on all field cost data. When such data is unavailable, the best a cost estimator can do is research the published data: man-hour cost estimates/equipment production and rental rates. To start a cost estimate from scratch or use an available database makes all the difference when thinking about productivity and accuracy. This means that the role of a cost estimator does not end with the completion of a cost estimate. Database development, improvement, and maintenance take the time that needs to be budgeted for.

Another benefit of benchmark data is using it to develop quick construction budgets on projects with limited engineering completion. This includes the order of magnitude, pre-feasibility and feasibility of construction budgets.

This benchmark data can be developed in-house from existing cost estimates/project budgets or industry publications.

As a rule of thumb, bench-marking at a high level would be as follows:

To help me achieve great end results before I start any work on a cost estimate, I do the following:

This concludes my notes on achieving a high-quality cost estimate for construction projects. I consider a cost estimate to be of high quality if:

I hope you liked my article. I am always happy to read and answer your comments.